Assembly of the engine has to be executed in the following order:
– bent shaft and rods; – connection of the right and left blocks of cylinders; – pistons; – heads of the block of cylinders; – camshafts; – assembly of yokes (engine of 2,2 l); – oil pump; – gear belt and pulleys; – covers of heads of the block of cylinders; – an oil receiver with the mesh filter; – oil pallet; – drive flywheel / plate; – external knots of the engine. |